Turbine Flexibility Options by Siemens

Below is the link to a presentation Steve Radke and Xavier Montesdeoca made at the EPRI Turbine-Generator User Group conference in August.  The presentation refers to steam turbine heating blankets as an option to increase start-up flexibility.

2017.08.15_CC02 – Operational Flexibility Options for Combined Cycle Steam Turbines – Steve Radke,

Please contact us at Sales@PSIPower.com to discuss how the PSI Turbine Warming System can add flexibility and savings to your steam turbine operations.

 

 

 


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s