Turbine Flexibility Options by Siemens

Below is the link to a presentation Steve Radke and Xavier Montesdeoca made at the EPRI Turbine-Generator User Group conference in August.  The presentation refers to steam turbine heating blankets as an option to increase start-up flexibility. 2017.08.15_CC02 – Operational Flexibility Options for Combined Cycle Steam Turbines – Steve Radke, Please contact us at sales@psipower.com to discuss … More Turbine Flexibility Options by Siemens

U.S. Electricity Markets changing Day-Ahead market timings

On September 29th the Southwest Power Pool (SPP) changed their Day-Ahead Market submission deadline to 09:30 am CPT for the Operating Day October 1st.  The Midcontinent Independent System Operator (MISO) will change their Day-Ahead deadline to 10:30 EPT on November 5 for the operating Day November 6.  These changes are being made to more closely align the … More U.S. Electricity Markets changing Day-Ahead market timings

U.S. Patent filing for PSI Turbine Warming System

Physical Systems Integration has recently filed a patent with the U.S. Patent and Trade office to document and protect the Turbine Warming System.  The system consists of insulating blankets with heating elements attached to inner blankets and a state-of-the-art control system.  PSI will install 2 of these systems in 2016 on GE D-11 Steam Turbines. Give PSI a … More U.S. Patent filing for PSI Turbine Warming System